Proposed Road Construction Plan for 2013:
A. Preparation of Lakeshore - approximately 0.7 miles for paving in
2014
B. Preparation of Recreation Drive- approximately 0.1 miles for
paving in
2014
C. Preparation of Ash Street- approximately 0.1 miles for paving in
2014
D. Preparation of Maple Street- approximately 0.1 miles for paving
in 2014
E. Preparation of Grove Street- approximately 0.1 miles for paving
in 2014
F. Preparation of Center Road- approximately 0.2 miles from Ash
towards
Ridge Road for paving in 2014
G. Paving of Moose Drive Road- approximately 0.3 miles
D. Paving of Center Road- approximately 0.3 miles
E. Re-construct and pave-approximately 1.0 mile of Three Rivers Road
Maintenance scheduled for 2013 include:
Crack Sealing will be done on a rotational basis each year with the
township having three sectors. Sector #1 was completed this year.
Rotation
is Sector#1 (2012,2015,etc.) , Sector #2 (2013,2016 etc.) and
Sector#3
(2014,2017, etc.).
A. Crack Sealing of SECTOR #2 approximately 8.5 miles of local roads
to
include the following roads: Jennings Terrace; Jennings Terrace
Court;
Four Seasons Drive; Whitetail Trail; Deer Run Trail; West River
Drive;
Lundy Drive; West Branch Drive; Pinehurst Drive; Beaver Court; and
West
River Court.
B. Three (two pass) brinings on the 10 miles of unpaved roads
C. Re-graveling of Wirtz Road- approximately 0.3 miles
D. Chip and Seal Redstone- approximately 0.1 miles
E. Chip and Seal West River Road - approximately 0.9 miles from
Beaver
Court to M-30
F. Chip and Seal Beaver Court - approximately 0.1 miles
G. Chip and Seal Cedar Lake Road- approximately 0.6 miles from N.
Pinecrerst Road north to end of curves.
H. Chip and Seal N. Pinecrest Road- approximately 0.1 miles
I. Request the county to Chip n Seal Secord Dam Road between Three
Rivers
and Lakeshore
|